⚠️ Top 5 Mistakes to Avoid in Solar Mounting Structures (And How to Fix Them)

Solar projects are designed to last for 25+ years — but one overlooked mistake in the mounting structure can lead to major problems: from water leakage and panel misalignment to structural failure and costly rework.

At Budhia Steel Works Pvt. Ltd., we’ve worked with 100+ EPC contractors across India, and we’ve seen the same costly errors repeat across projects. Let’s break them down — and more importantly, how to avoid them with smart planning and quality sourcing.


🚫 Mistake #1: Choosing the Wrong Steel Quality

❌ The Issue:

Many project developers compromise by choosing low-grade, locally sourced steel — leading to corrosion, bending, or cracking within 3–5 years.

✅ The Fix:

Always use prime-quality steel from reputed mills (like JSW) and insist on pre-galvanized or hot-dip galvanized finishes. Budhia Steel only uses traceable, high-grade raw material with full quality certification.


🚫 Mistake #2: Ignoring Wind Load Calculations

❌ The Issue:

In high-wind zones (like coastal areas or open fields), structures face dynamic pressure. Without proper wind-load analysis, mounting frames may twist, loosen, or collapse.

✅ The Fix:

Ensure your mounting structure is designed based on IS875 wind load standards, with the correct span, purlin profile, and anchor bolts. Our design team offers support on request for load-based engineering.


🚫 Mistake #3: Using Improper Purlins or Spacing

❌ The Issue:

Incorrect spacing or under-designed purlins (like using thin C purlins) can cause panel misalignment, sagging, or vibration issues.

✅ The Fix:

Opt for hat purlins with a higher strength-to-weight ratio, especially for rooftop solar or high-load projects. Budhia’s purlins are precision-formed and tested for deflection and bending performance.


🚫 Mistake #4: Lack of Pre-Punched Components

❌ The Issue:

If components arrive without pre-punched holes or standardized fittings, laborers spend time cutting and drilling on site — resulting in misalignment, extra labor cost, and delays.

✅ The Fix:

Use factory-processed components with pre-punched slots, channels, and bracing. At Budhia Steel, every strut, bracket, and purlin is ready-to-install and comes with complete assembly drawing support.


🚫 Mistake #5: Vendor Selection Based Only on Price

❌ The Issue:

Cheapest suppliers often cut corners — offering uncoated steel, poor welding, or low-grade zinc coatings — which leads to rusting, loosening, and reduction in plant ROI.

✅ The Fix:

Choose a reputed manufacturer with proven track record, in-house QA, and full product traceability. Budhia Steel Works offers:


🏁 Bonus Tip: Always Check for ISO Certification & QC Reports

Ask your structure supplier to provide:

It ensures you’re not just buying steel — you’re investing in peace of mind.


💡 Conclusion: Build It Right, Build It Strong

Your solar mounting structure is more than a frame — it’s the foundation of your project’s performance. Avoiding these common mistakes means:


📞 Need Support with Solar Structures? Let’s Connect.

📧 Email us at: solar@budhiasteel.com
📞 Call now: +91-9887111157
🌐 Visit: www.budhiasteel.com


“The cost of a poor structure is always paid in the future. Build smart today — with Budhia Steel.”